Description |
Pakistan Council for Renewable Energy Technologies (PCRET) is establishing Pak-Korea PV Module Testing Laboratory on Plot No 55, Street 07, H-8/4, Islamabad. Currently, the building is running on 35 KW temporary electricity load. IESCO, Islamabad has granted the sanction load of 1.2 MW as per the demand of the laboratory. Therefore, services of well reputed firms/manufactures duly registered with IESCO, PEC, FBR and other relevant authorities are required to supply, install and commission the 1.2 MW load of electricity infrastructure as per IESCO/ NEPRA Specs. |